Once the pipeline is completed, the Leipzig plant will no longer require hydrogen deliveries via truck in cylinders. “Thanks to the pipeline supply, we will be able to utilize hydrogen in entirely new ways, particularly for our energy-intensive processes such as drying ovens in painting,” states Petra Peterhànsel, Director of the BMW Group Leipzig plant.
In October 2022, the Leipzig facility became the first in global automotive production to implement a flexible fuel burner within its paint shop. Today, the plant operates a total of eleven dual-fuel burners, flexibly supplied by gas or hydrogen. As early as 2013, Leipzig had introduced hydrogen fuel cell-powered forklifts and towing tractors and now manages an intralogistics fleet of over 230 such vehicles – the largest in Europe.
The vehicles refuel at nine hydrogen refueling stations located within the plant’s halls. The central hydrogen network is a national infrastructure project that plans to construct approximately 9,000 kilometers of dedicated pipelines, which will be gradually activated by 2032, connecting Germany to the interregional hydrogen network.
Photo: BMW Group Italy press office
